SPINACH CHIN'S DECK CONSTRUCTION

CLICK ON AN IMAGE TO VIEW AT FULL RESOLUTION

PROJECT COMPLETION - AUTUMN 2024

SUMMER 2024

April 23, 2024

setting a level line - batter boards in place

April 24, 2024

found footer from old porch 3 inches into first hole - had to break out the power hammer

April 26, 2024

holes dug - measuring up and leveling - getting ready to pour

April 27, 2024

#1 and #2 poured - #3 almost ready - Then ran into this MF rock

April 29, 2024

pipe repair and seating for two - hardheaded and determined

April 30, 2024

#4 - dug - leveled - ready to pour - poured #3 and #4 - 13 eighty pound bags in 1 hr and 45 minutes

May 3, 2024

temporary ledger and buildup beam for checking level - need to build a model to see it

May 7, 2024

lumber and gravel - i can see my floors

May 8, 2024

damp shipment - more braces than a room full of teenagers - warning ducks

May 9, 2024

always - dug around by hand - got a rope around it - called it a whore and pulled hard

May 12, 2024

ledger board up - major step needed for everything else

May 14, 2024

ledger board up solidly - bolts - wood stained - bit destruction

May 15, 2024

it's level eat me whore - second notch and support beams (2) 2"x10" x 12' and (1) 2"x10" x 12' screwed in - all surprisingly level

May 19, 2024

 

thanks bob

May 20, 2024

so far 16 joists / 2 brackets per x 10 screws each / haven't screwed this much since i was a teenager

May 30, 2024

railing posts up / looks like cement day tomorrow

May 31, 2024

one done / and two

June 2, 2024

end of deck done for stairs / rail posts up /ready to start putting down floor

June 5, 2024

threw up some of the 16 footers for a visual

June 9, 2024

major thanks to ph and bob / couldn't have gotten this much finished with only two people or me / toboggan boards

June 12, 2024

T minus 13 days and counting

June 15, 2024

next phase done / now 9000 balusters to sand and paint / fourth bandana / third shirt / 1/2 gallon of water and a quart of pedialyte / BRUTAL outside

June 18, 2024

first section done / second section up / one side done / wood cut and ready for sanding for next two sections